The new synthetic intramural athletic field is 100% recyclable.

October 24, 2011
The new synthetic intramural athletic field is 100% recyclable. It eliminates the need for fertilizer, pesticide, or herbicide applications, and requires 95% less water than the previous field.  The energy-efficient lighting units cost only $7.60 per hour to operate.